Whole-house renovation / refurbishment: cost a whole project, stage by stage
Strip-out, services, plastering, kitchens and bathrooms, floors, decorating. JobBosh lays the project out as 18 stages: 15 are calculated by their own recipes from your measurements; the rest - design, steel, windows, certificates - are priced from a quotation or a figure you already hold, and it says so until you have it.
The stages
| Stage | Work | How it is costed | Enquiries it may need | |
|---|---|---|---|---|
| Site set-up and protection | Welfare, protection, skips | by someone else's figure | Skip hire | usual |
| Demolition / strip-out | Strip-out | calculated by its recipe | - | usual |
| First fix (carpentry, plumbing, electrics) | Rewire / electrics | calculated by its recipe | - | usual |
| First fix (carpentry, plumbing, electrics) | Heating | calculated by its recipe | - | usual |
| First fix (carpentry, plumbing, electrics) | Bathroom plumbing | calculated by its recipe | - | usual |
| Plastering and finishing | Re-skim | calculated by its recipe | - | usual |
| Plastering and finishing | Board and skim where stripped | calculated by its recipe | - | usual |
| Kitchens and bathrooms | Kitchen | calculated by its recipe | - | usual |
| Kitchens and bathrooms | Bathroom | calculated by its recipe | - | usual |
| Kitchens and bathrooms | Tiling | calculated by its recipe | - | usual |
| Second fix | Doors | calculated by its recipe | - | usual |
| Second fix | Skirting and architrave | calculated by its recipe | - | usual |
| Flooring | Floors | calculated by its recipe | - | usual |
| Decorating | Decorate walls and ceilings | calculated by its recipe | - | usual |
| Decorating | Decorate woodwork | calculated by its recipe | - | usual |
| External works | Gutters | calculated by its recipe | - | optional |
| Commissioning and inspections | Electrical and gas certificates | Certificates | - | usual |
| Snagging and handover | Snagging and handover | by someone else's figure | - | usual |
What you get
- Every stage's quantities and hours from its recipe, priced at your rates and prices; the specialist stages as named unknowns until a quotation or your figure resolves them - never a guess
- Supplier enquiries drafted from the job's facts for scaffold, skips, steel, windows, the professions - approved by you before anything is sent, replies compared like for like
- Travel, parking and road charges from the dated catalogue; the site questions (welfare, power, water, access, protection, waste) as lines, enquiries and sentences in the document
- A phased, branded quotation itemised by stage that reconciles to the penny, with provisional allowances shown apart, accepted on a secure link; variations recorded against it