Hang internal doors (new door and ironmongery): calculator for UK builders
Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.
What it works out
- Material: Solid-core door; Hinges (3 per door), latch, handles, door stop
- Labour: Hang doors
- Waste: Old doors / linings to dispose
The questions it asks
| Question | Unit / choices | Required? | Help |
|---|---|---|---|
| Doors to hang | nr | required | |
| New door linings / frames too? | yes / no | optional - default no (labelled assumed) | |
| Door type | one of: hollow core, solid core, fire door fd30 | optional - default solid_core (labelled assumed) | |
| Remove existing doors? | yes / no | optional - default yes (labelled assumed) |
The norms behind it, with their sources
Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.
| Norm | Value | Source | Tier |
|---|---|---|---|
| Hang a door incl. hinges, latch, handles, stop | 2 hr/door | trade practice | assumed |
| Fit a lining / frame and architrave | 1.5 hr/door | trade practice | assumed |
| Extra for FD30: intumescent strips, closer | 0.75 hr/door | trade practice | assumed |
A worked example
Answers used: Doors to hang 2 nr; New door linings / frames too? no; Door type solid core; Remove existing doors? yes. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.
| Kind | Line | Quantity | How it is worked out |
|---|---|---|---|
| material | Solid-core door | 2 nr 2 x nr - each | 2 doors |
| material | Hinges (3 per door), latch, handles, door stop | 2 nr 2 x nr - set per door | 2 sets |
| labour | Hang doors | 4 hr | 2 x 2 h |
| waste | Old doors / linings to dispose | 0.16 m3 | 2 x 0.08 m3 |
Labour on this example: about 4 hours across the roles; at your rates it becomes money.
Site questions this work raises: Protection and cleanliness, Waste.
Then what
Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.