Demolition and clearance calculator - free

Strip-out, soft demolition and clearance: calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Labour: Strip out and load
  • Waste: Mixed waste to skip (bulked)
  • Material: Dust sheets, zip doors, floor protection, PPE
  • Plant: Breaker / tool hire
  • Fee: Asbestos refurbishment survey before strip-out (pre-2000 property) - laboratory fee

The questions it asks

QuestionUnit / choicesRequired?Help
Volume to remove (loose)m3requiredA 6-yard skip is ~4.6 m3; an 8-yard ~6 m3. A full room strip-out is often 4-8 m3.
Non-load-bearing walls to take downm2optional - default 0 (labelled assumed)
Any structural removal (load-bearing wall, chimney breast)?yes / nooptional - default no (labelled assumed)
Property built before 2000?yes / nooptional - default yes (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Strip out and load per m31.5 hr/m3trade practiceassumed
Take down a stud / single-skin wall per m2 and clear0.8 hr/m2trade practiceassumed
Rubble per m2 of wall removed (bulked)0.05 m3/m2trade practiceassumed

A worked example

Answers used: Volume to remove (loose) 1 m3; Non-load-bearing walls to take down 0 m2; Any structural removal (load-bearing wall, chimney breast)? no; Property built before 2000? yes. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
labourStrip out and load1.5 hr1 m3 x 1.5 h/m3
wasteMixed waste to skip (bulked)1 m31 m3
materialDust sheets, zip doors, floor protection, PPE1 itemone allowance
plantBreaker / tool hire1 hire-day1 day per ~15 m2 of wall
feeAsbestos refurbishment survey before strip-out (pre-2000 property) - laboratory fee1 itemneeds a quotation or your figure - never invented

Labour on this example: about 1.5 hours across the roles; at your rates it becomes money.

Site questions this work raises: Protection and cleanliness, Waste, Site access and neighbours, Parking and traffic, Utilities and welfare, Commercial and contract.

Specialists or hire it may need, drafted as enquiries from the job's facts: Skip hire.

A refurbishment/demolition asbestos survey is required before intrusive work on a pre-2000 property.

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.