JobBoshOpen JobBosh
Electrical calculator - free

Electrical: new points, circuits, consumer unit (certified electrician): calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Material: Twin & earth cable (2.5 / 1.5 mm2); Back boxes, faceplates, clips, capping
  • Subcontract: Registered electrician: 2 points, 0 circuits incl. certification - by quotation
  • Labour: Chase walls, cap, make good (builder's work)
  • Waste: Chasing rubble, packaging

The questions it asks

QuestionUnit / choicesRequired?Help
New / moved points (sockets, switches, lights)nrrequired
New circuitsnroptional - default 0 (labelled assumed)
Replace the consumer unit?yes / nooptional - default no (labelled assumed)
Who does the specialist work?one of: own team, existing specialist, find subcontractor, mixedoptional - default find_subcontractor (labelled assumed)Own team: priced at your rates. Existing specialist: you enter their figure. Find subcontractor: JobBosh drafts the enquiry from the job facts. Mixed: your team's part at your rates plus the specialist's figure. JobBosh never decides who may do the work.
Finishone of: chased and plastered, surface trunkingoptional - default chased_and_plastered (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Install a point incl. cabling1.25 hrtrade practiceassumed
Run and test a new circuit4 hrtrade practiceassumed
Replace a consumer unit incl. testing6 hrtrade practiceassumed
Chase, cap and make good per point (builder's work)0.75 hrtrade practiceassumed
Twin & earth per point12 m/pointtrade practiceassumed

A worked example

Answers used: New / moved points (sockets, switches, lights) 2 nr; New circuits 0 nr; Replace the consumer unit? no; Who does the specialist work? find subcontractor; Finish chased and plastered. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
materialTwin & earth cable (2.5 / 1.5 mm2)26.4 m
1 x roll - 100 m drums
2 x 12 m + 0 x 25 m
materialBack boxes, faceplates, clips, capping2 nr
2 x nr - set per point
2
subcontractRegistered electrician: 2 points, 0 circuits incl. certification - by quotation1 itemneeds a quotation or your figure - never invented
labourChase walls, cap, make good (builder's work)1.5 hr2 x 0.75 h
wasteChasing rubble, packaging0.04 m32 x 0.02 m3

Labour on this example: about 1.5 hours across the roles; at your rates it becomes money.

Site questions this work raises: Utilities and welfare, Protection and cleanliness.

Specialists or hire it may need, drafted as enquiries from the job's facts: Electrician (registered).

Notifiable work (new circuits, consumer unit, bathroom circuits) needs a Part P certificate from the registered electrician: a cost line, not an option.

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.

Start a electrical: new points, circuits, consumer unit (certified electrician) job now