Project costing - free
Small new build (single dwelling, outbuilding): cost a whole project, stage by stage
The whole stage ladder; most stages call a recipe, the rest are quotations. JobBosh lays the project out as 23 stages: 0 are calculated by their own recipes from your measurements; the rest - design, steel, windows, certificates - are priced from a quotation or a figure you already hold, and it says so until you have it.
The stages
| Stage | Work | How it is costed | Enquiries it may need | |
|---|---|---|---|---|
| Preliminary works | Preliminary works | Preliminary works - by quotation | - | optional |
| Survey, design and engineering | Survey, design and engineering | Survey, design and engineering - by quotation | - | optional |
| Permissions and notices | Permissions and notices | Permissions and notices - by quotation | - | optional |
| Site set-up and protection | Site set-up and protection | Site set-up and protection - by quotation | - | optional |
| Demolition / strip-out | Demolition / strip-out | Demolition / strip-out - by quotation | - | optional |
| Groundworks and drainage | Groundworks and drainage | Groundworks and drainage - by quotation | - | optional |
| Foundations | Foundations | Foundations - by quotation | - | optional |
| Structural work | Structural work | Structural work - by quotation | - | optional |
| Walls and openings | Walls and openings | Walls and openings - by quotation | - | optional |
| Roofing | Roofing | Roofing - by quotation | - | optional |
| Insulation | Insulation | Insulation - by quotation | - | optional |
| Windows and external doors | Windows and external doors | Windows and external doors - by quotation | - | optional |
| First fix (carpentry, plumbing, electrics) | First fix (carpentry, plumbing, electrics) | First fix (carpentry, plumbing, electrics) - by quotation | - | optional |
| Second fix | Second fix | Second fix - by quotation | - | optional |
| Plastering and finishing | Plastering and finishing | Plastering and finishing - by quotation | - | optional |
| Flooring | Flooring | Flooring - by quotation | - | optional |
| Kitchens and bathrooms | Kitchens and bathrooms | Kitchens and bathrooms - by quotation | - | optional |
| Decorating | Decorating | Decorating - by quotation | - | optional |
| External works | External works | External works - by quotation | - | optional |
| Landscaping | Landscaping | Landscaping - by quotation | - | optional |
| Waste | Waste | Waste - by quotation | - | optional |
| Commissioning and inspections | Commissioning and inspections | Commissioning and inspections - by quotation | - | optional |
| Snagging and handover | Snagging and handover | Snagging and handover - by quotation | - | optional |
What you get
- Every stage's quantities and hours from its recipe, priced at your rates and prices; the specialist stages as named unknowns until a quotation or your figure resolves them - never a guess
- Supplier enquiries drafted from the job's facts for scaffold, skips, steel, windows, the professions - approved by you before anything is sent, replies compared like for like
- Travel, parking and road charges from the dated catalogue; the site questions (welfare, power, water, access, protection, waste) as lines, enquiries and sentences in the document
- A phased, branded quotation itemised by stage that reconciles to the penny, with provisional allowances shown apart, accepted on a secure link; variations recorded against it