JobBoshOpen JobBosh
Roofing and guttering calculator - free

Flat roof renewal (EPDM / GRP / felt): calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Material: EPDM membrane + adhesive + trims; 18 mm OSB3 decking (2440 x 1220); Edge trims, drip, outlets, sealant
  • Labour: Strip old covering and deck; Lay new deck; Lay covering and trims
  • Waste: Old felt, deck, insulation

The questions it asks

QuestionUnit / choicesRequired?Help
Flat roof aream2required
Systemone of: epdm, grp, torch on feltoptional - default epdm (labelled assumed)
Renew the decking?yes / nooptional - default yes (labelled assumed)
Add insulation (warm roof)?yes / nooptional - default no (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Strip old covering per m20.2 hr/m2trade practiceassumed
Lay new OSB deck per m20.3 hr/m2trade practiceassumed
Lay covering incl. trims per m20.5 hr/m2trade practiceassumed

A worked example

Answers used: Flat roof area 20 m2; System epdm; Renew the decking? yes; Add insulation (warm roof)? no. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
materialEPDM membrane + adhesive + trims22 m2
22 x m2 - per m2 (kits by area)
20 m2 +10 %
material18 mm OSB3 decking (2440 x 1220)22 m2
8 x sheet - 2.98 m2 sheets
20 m2
materialEdge trims, drip, outlets, sealant1 itemone allowance
labourStrip old covering and deck4 hr20 m2 x 0.2 h/m2
labourLay new deck6 hr20 m2 x 0.3 h/m2
labourLay covering and trims10 hr20 m2 x 0.5 h/m2
wasteOld felt, deck, insulation1 m320 m2 x 0.05 m3/m2

Labour on this example: about 20 hours across the roles; at your rates it becomes money.

Site questions this work raises: Access equipment and temporary works, Waste, Parking and traffic.

Specialists or hire it may need, drafted as enquiries from the job's facts: Waste removal (man and van / clearance).

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.

Start a flat roof renewal (epdm / grp / felt) job now