Bricklaying calculator - free

Brick / block wall (new build or extension wall): calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Material: Facing bricks; Concrete blocks 100 mm (440 x 215); Building sand (bulk bag); Cement (25 kg); Mortar plasticiser; Stainless wall ties + clips; ...
  • Labour: Lay facing brickwork; Labourer: mixing, loading out, cleaning; Lay blockwork
  • Plant: Cement mixer hire
  • Waste: Masonry waste (broken bricks, mortar droppings, packaging)

The questions it asks

QuestionUnit / choicesRequired?Help
Wall lengthmrequired
Wall heightmrequired
Constructionone of: half brick facing, cavity brick block, block single 100, block single 140, one brick solidoptional - default cavity_brick_block (labelled assumed)
Openings to deduct (doors, windows)m2optional - default 0 (labelled assumed)
Cavity insulationone of: none, partial fill board, full fill battsoptional - default full_fill_batts (labelled assumed)
Lintels over openingsnroptional - default 0 (labelled assumed)
External wall (weather, scaffold at height)?yes / nooptional - default yes (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Facing bricks per m2, half-brick wall, 10 mm joints60 nr/m2standard metric brick 215 x 102.5 x 65 with 10 mm jointassumed
Blocks per m2 (440 x 215)10 nr/m2standard blockassumed
Brick cutting / breakage5 %trade practiceassumed
Mortar per 1000 bricks0.55 m3/1000trade practice (1:1:6 or 1:4)assumed
Mortar per 100 blocks0.5 m3/100trade practiceassumed
Building sand per m3 of mortar1800 kg/m3trade practiceassumed
Cement 25 kg bags per m3 of 1:4 mortar11 bags/m3trade practiceassumed
Wall ties per m2 of cavity wall2.5 nr/m2typical 900 x 450 spacingassumed
Lay facing brick per m2 (bricklayer + labourer share)1.1 hr/m2trade practice ~400 bricks/day/gangassumed
Lay blockwork per m20.5 hr/m2trade practiceassumed
DPC length per metre of wall1 m/mone courseassumed

A worked example

Answers used: Wall length 4 m; Wall height 4 m; Construction cavity brick block; Openings to deduct (doors, windows) 0 m2; Cavity insulation full fill batts; Lintels over openings 0 nr; External wall (weather, scaffold at height)? yes. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
materialFacing bricks1008 nr
3 x pack - packs of ~400
16 m2 x 60 per m2, +5 %
materialConcrete blocks 100 mm (440 x 215)168 nr
168 x nr - sold per block / per pack of ~70
16 m2 x 10 per m2, +5 %
materialBuilding sand (bulk bag)2629.44 kg
4 x bag - bulk bag ~800 kg
1.33 m3 mortar x 1800 kg/m3
materialCement (25 kg)401.72 kg
17 x bag - 25 kg bags
1.33 m3 x 11 bags/m3
materialMortar plasticiser2.66 L
1 x tin - 5 L
1.33 m3 x 2 L/m3
materialStainless wall ties + clips40 nr
1 x pack - box of 250
16 m2 x 2.5 per m2
materialCavity insulation batts (full fill)16.8 m2
5 x pack - packs of ~4 m2
16 m2 of cavity
materialDamp-proof course (roll)8 m
1 x roll - 30 m rolls
4 m x 2 leaves
labourLay facing brickwork17.6 hr16 m2 x 1.1 h/m2
labourLabourer: mixing, loading out, cleaning10.56 hr60 % of bricklayer hours
labourLay blockwork8 hr16 m2 x 0.5 h/m2
plantCement mixer hire5 hire-dayone hire-day per gang day
wasteMasonry waste (broken bricks, mortar droppings, packaging)0.32 m316 m2 x 0.02 m3/m2

Labour on this example: about 36.16 hours across the roles; at your rates it becomes money.

Site questions this work raises: Site access and neighbours, Parking and traffic, Utilities and welfare, Waste, Access equipment and temporary works.

Specialists or hire it may need, drafted as enquiries from the job's facts: Scaffolding, Materials (merchant) delivery.

Walls above 1.5 m: scaffold or tower, priced by quotation.

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.