JobBoshOpen JobBosh
Groundworks and drainage calculator - free

Below-ground drainage run (110 mm) with inspection chambers: calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Material: 110 mm underground drainage pipe; Couplers, bends, junctions, rocker pipes; 450 mm plastic inspection chambers + covers; Pea gravel 10 mm
  • Plant: Mini-digger hire
  • Labour: Excavate, lay and backfill
  • Waste: Surplus spoil (bulked)

The questions it asks

QuestionUnit / choicesRequired?Help
Drain run lengthmrequired
Inspection chambersnroptional - default 1 (labelled assumed)
Average invert depthmoptional - default 0.9 (labelled assumed)
Surface to reinstateone of: soil, paving, tarmac, concreteoptional - default soil (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Pea gravel bed and surround per metre0.25 t/m150 mm bed + 150 mm surround in a 450 mm trenchassumed
Excavate, lay, surround, backfill per metre (machine)1.2 hr/mtrade practiceassumed
Set a plastic inspection chamber3 hrtrade practiceassumed

A worked example

Answers used: Drain run length 4 m; Inspection chambers 1 nr; Average invert depth 0.9 m; Surface to reinstate soil. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
material110 mm underground drainage pipe4.2 m
2 x length - 3 m lengths
4 m
materialCouplers, bends, junctions, rocker pipes5.33 nr
6 x nr - each
4/3 + 4
material450 mm plastic inspection chambers + covers1 nr
1 x nr - each
1
materialPea gravel 10 mm1 t
2 x bag - bulk bags
4 m x 0.25 t/m
plantMini-digger hire1 hire-dayhire-days = dig days
labourExcavate, lay and backfill7.8 hr4 m x 1.2 h + 1 x 3 h
wasteSurplus spoil (bulked)0.84 m34 m x 0.45 m x 0.9 m x 40 % surplus x 1.3

Labour on this example: about 7.8 hours across the roles; at your rates it becomes money.

Site questions this work raises: Site access and neighbours, Waste, Utilities and welfare, Commercial and contract.

Specialists or hire it may need, drafted as enquiries from the job's facts: Grab lorry / muck-away, Plant hire.

Connections to a public sewer need the water company's consent; building control inspects before backfill.

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.