Painting and decorating calculator - free

Paint woodwork (skirting, architrave, doors, windows): calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Material: Undercoat; Satin topcoat
  • Labour: Sand, fill and caulk woodwork; Paint woodwork (1 undercoat + 1 topcoat)

The questions it asks

QuestionUnit / choicesRequired?Help
Skirting and architrave lengthmrequired
Doors (both faces)nroptional - default 0 (labelled assumed)
Window frames (internal face)nroptional - default 0 (labelled assumed)
Finishone of: satin, gloss, eggshelloptional - default satin (labelled assumed)
Bare or stripped timber (needs primer)?yes / nooptional - default no (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Painted area per metre of skirting + architrave0.15 m2/m150 mm average faceassumed
Painted area per door, both faces incl. edges3.6 m2/doorstandard 1981 x 762 mm doorassumed
Painted area per window frame internal face1.2 m2/windowtypical domestic windowassumed
Undercoat coverage14 m2/Ltypical manufacturer figureassumed
Satin / gloss coverage16 m2/Ltypical manufacturer figureassumed
Wood primer coverage12 m2/Ltypical manufacturer figureassumed
Tin size2.5 Lcommon trade tinassumed
Brush application rate on trim per coat0.5 hr/m2trade practice; trim is slowassumed
Sand, fill, caulk per m2 of trim0.3 hr/m2trade practiceassumed

A worked example

Answers used: Skirting and architrave length 4 m; Doors (both faces) 0 nr; Window frames (internal face) 0 nr; Finish satin; Bare or stripped timber (needs primer)? no. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
materialUndercoat0.05 L
1 x tin - 2.5 L tins
0.60 m2 / 14 m2 per litre
materialSatin topcoat0.04 L
1 x tin - 2.5 L tins
0.60 m2 / 16 m2 per litre
labourSand, fill and caulk woodwork0.18 hr0.60 m2 x 0.3 h/m2
labourPaint woodwork (1 undercoat + 1 topcoat)0.6 hr0.60 m2 x 2 coats x 0.5 h/m2

Labour on this example: about 0.78 hours across the roles; at your rates it becomes money.

Site questions this work raises: Protection and cleanliness.

Trim area 0.60 m2.

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.

Start a paint woodwork (skirting, architrave, doors, windows) job now