Carpentry and joinery calculator - free

Renew / repair timber floor (joists and boards): calculator for UK builders

Answer the measurements this calculation needs and JobBosh works out the materials with wastage and pack rounding, the labour hours by role, the plant, the waste and the site needs - then prices them from your own figures, a supplier's quotation or a dated price you record. Free, no account needed to start.

What it works out

  • Material: 22 mm T&G flooring-grade chipboard (2400 x 600)
  • Labour: Take up existing floor and clear; Lay new flooring
  • Waste: Old flooring / joists (timber waste)

The questions it asks

QuestionUnit / choicesRequired?Help
Floor aream2required
Scopeone of: boards only, boards and some joists, full renewaloptional - default boards_only (labelled assumed)
Deckingone of: t and g chipboard 22, softwood boards, plywood 18optional - default t_and_g_chipboard_22 (labelled assumed)

The norms behind it, with their sources

Coverage, productivity and wastage defaults you can edit; each carries where it comes from and is shown as assumed until your own benchmark replaces it.

NormValueSourceTier
Lay flooring per m20.4 hr/m2trade practiceassumed
Renew joists per m2 incl. hangers0.8 hr/m2trade practiceassumed
Take up existing floor per m20.25 hr/m2trade practiceassumed
Joist length per m2 at 400 mm centres2.5 m/m2trade practiceassumed

A worked example

Answers used: Floor area 20 m2; Scope boards only; Decking t and g chipboard 22. These are the recipe's own quantities for those answers - the prices are yours, the supplier's or a quotation's, never a figure typed on a web page.

KindLineQuantityHow it is worked out
material22 mm T&G flooring-grade chipboard (2400 x 600)22 m2
16 x sheet - 1.44 m2 per sheet
20 m2 +10 %
labourTake up existing floor and clear5 hr20 m2 x 0.25 h/m2
labourLay new flooring8 hr20 m2 x 0.4 h/m2
wasteOld flooring / joists (timber waste)0.8 m320 m2 x 0.04 m3/m2

Labour on this example: about 13 hours across the roles; at your rates it becomes money.

Site questions this work raises: Protection and cleanliness, Waste, Site access and neighbours.

Specialists or hire it may need, drafted as enquiries from the job's facts: Waste removal (man and van / clearance).

Check sub-floor ventilation and DPC while the floor is up.

Then what

Price the lines from your crew rates and your material prices (each with its source and date), answer the site questions (parking, skip, welfare, power, water, protection), let JobBosh draft the supplier enquiries you approve, and issue a branded quotation your customer accepts on a secure link. Guest work is kept for 14 days; a free account keeps it for good.